<-- Back to Free Visit Page

FREE SEMINARS

Free for all to attend

 

On-Floor Seminar Theatres Day 1

Latest Technologies
11:00

Latest technology showcase by TUV Rheinland

Session led by: tüv-rheinland
Track Infrastructure & Project Management
11:00

Track infrastructure case study

North Asian Rail Innovations
11:00

行車紀錄影像在軌道條件監控之應用

The application of diving recorder to rail track condition monitoring Presented in Mandarin
Ching Lung Liao, Chairman, Chung Hwa Railway Industry Development Association Ltd
Track Infrastructure & Project Management
11:30

Trackside measures to reduce passengers and drive noise impact

Christoph Gramowski, Director of R&D, Schrey & Veit
Session led by: schrey-&-veit
North Asian Rail Innovations
11:30

電力牽引系統的車網關係

Presented in Mandarin
Liu Zhigang, Professor, Southwest Jiaotong University
Latest Technologies
12:00

Latest technology showcase by Milwaukee

Session led by: milwaukee-tool
Track Infrastructure & Project Management
12:00

Predicting fault of mechanical facility using ICT (SAMBA)

Youngdae Lee, Deputy General Manager, Seoul Metro
Ik Tae Kim, Assistant Manager/Mechanical Engineering Department, Seoul Metro
Session led by: seoul-metro
North Asian Rail Innovations
12:00

道岔伤损实时监测

Presented in Mandarin
Xiongjie Zhang, Director Assistant of R & D Senior Engineer, China southwest jiaotong university RailWay Development CO.,LTD
Latest Technologies
12:30

Latest technology showcase by Lantech

Session led by: lantech-communications-global-inc
Track Infrastructure & Project Management
12:30

Track infrastructure case study by HK Polytechnic

Yanjie Zhu, Research Associate, The Hong Kong Polytechnic University
Lu Zhou, Research Fellow, The Hong Kong Polytechnic University
North Asian Rail Innovations
12:30

中国磁浮交通发展与应用展望

Development and application prospect of China's Maglev transportationPresented in Mandarin
Xiaohong Chen, Professor, Tongji University
Latest Technologies
13:00

Latest technology showcase by Datumstruct

Session led by: datumstruct-(cfs)-pte-ltd
Track Infrastructure & Project Management
13:00

Track infrastructure case study

North Asian Rail Innovations
13:00

城市轨道交通车辆先进维保技术的研究和应用

Research and application of advanced maintenance technology for urban rail vehiclesPresented in Mandarin
Zhiqiang Zhang, Vice Director of National Engineering Laboratory for High-Speed Train, CRRC CORPORATION
Latest Technologies
13:30

How thermal camera technology can improve safety and efficiency in public transport in Japan

Yoshito Takei, International Sales Manager, ITS, FLIR Systems
Session led by: flir-systems
Track Infrastructure & Project Management
13:30

Track infrastructure case study by voestalpine

Wallace Wang, Head of Sales, voestalpine Railway Systems
Session led by: voestalpine-railway-systems
North Asian Rail Innovations
13:30

城轨机电系统集成技术与创新发展

Innovation development of integrated technology of urban rail electro-mechanical systemPresented in Mandarin
Chaolu Chen, Professor level senior engineer, CRRC CORPORATION
Latest Technologies
14:00

The application of CO2 as a refrigerant in passenger car air conditioning

Deneitz Geyser, Design Engineer, Noske-Kaeser Rail & Vehicle
Session led by: noske-kaeser-rail-&-vehicle
Track Infrastructure & Project Management
14:00

BIM 4 FIELD: Benefits for linear infrastructure construction activities

Hugues Zarka, BIM Regional Manager for Asia & Pacific, Systra
Session led by: systra
North Asian Rail Innovations
14:00

Introduction of Chinese carbon strip

Presented in Mandarin
Zhicang Zhao, Vice General Manager, Suzhou Doneka New Materials Corp. Ltd.
Latest Technologies
14:30

Latest technology showcase by PPS

Session led by: p.p.s.-international
North Asian Rail Innovations
14:30

铁路车辆综合布线

Certified cable management - from rolling stock to infrastructurePresented in Mandarin
Simon Chan, Vice General Manager, HellermannTyton (Wuxi) Electrical Accessories Co., Ltd.
Latest Technologies
15:00

Latest technology showcase by JR East

Session led by: east-japan-railway-company
Track Infrastructure & Project Management
15:00

Project management case study

Track Infrastructure & Project Management
15:30

The role of consultant in railway delivery framework

Matthew Tsang, Associate Director, Arup
Session led by: arup
Latest Technologies
16:00

Mobile coverage solutions for metro and rail

Jack Mar, Chief Executive Officer, Sunwave Solutions
Session led by: sunwave-solutions
Latest Technologies
16:30

Latest technology showcase by Wabtec

Session led by: wabtec
Track Infrastructure & Project Management
16:30

Project management case study

Latest Technologies
17:00

Latest technology showcase by PlanGrid

last published: 12/Feb/19 11:05 GMT

 

On-Floor Seminar Theatres Day 2

Track Infrastructure & Project Management
11:00

Project management case study

Safety, Reliability & Disruption Management
11:00

Research sharing session from City University of Hong Kong - Safety, Reliability and Disruption Management of High Speed Rail and Metro Systems [T32-101/15-R]

Latest Technologies
11:30

Latest technology showcase by TUV Rheinland

Session led by: tüv-rheinland
Track Infrastructure & Project Management
11:30

Track infrastructure case study

Track Infrastructure & Project Management
12:00

Project management case study

Latest Technologies
12:30

Is MaaS the future of public transport ticketing?

Paul Gwynn, Managing Director, INIT
Session led by: init-gmbh
Track Infrastructure & Project Management
12:30

Track infrastructure case study

Latest Technologies
13:00

Latest technology showcase by Huawei

Session led by: huawei-technologies-co.,-ltd.
Track Infrastructure & Project Management
13:00

Project management case study

Latest Technologies
14:00

Latest technology showcase by Linsinger

Session led by: linsinger
Track Infrastructure & Project Management
14:00

Project management case study

Latest Technologies
14:30

How we can improve rail training through AI, VR and AR from the mobile phone

Rayvan Ho, Director Business Development, Acktec Technologies
Session led by: acktec-technologies
Track Infrastructure & Project Management
14:30

Track infrastructure case study

Latest Technologies
15:00

The route to the gigabit train

Nir Hayzler, Vice President,Head of Strategic Industries LoB, RADWIN
Session led by: radwin
Track Infrastructure & Project Management
15:00

Project management case study

Track Infrastructure & Project Management
15:30

Track infrastructure case study

Latest Technologies
16:00

Smart stations: now and future

Hyun Seung Jang, Professional, Seoul Metro
Session led by: seoul-metro
last published: 12/Feb/19 11:05 GMT