Nikhil Swami | Executive Engineer
Kolkata Metro Rail Corporation Limited | India

Nikhil Swami, Executive Engineer, Kolkata Metro Rail Corporation Limited

Mr. Nikhil Swami is working as Executive Engineer for Kolkata Metro East-West Line Project of Government of India. Mr. Swami is having an experience of 9 years in S&T project management, contract management, resource planning, tendering, procurement, design and interface and overall metro project execution. Mr. Swami has handled different system packages like, Signalling, Telecommunications, Platform Screen Doors, Automatic Fare Collections, etc. and presented technical papers at Bangalore, Delhi, London and Singapore, etc. In addition, Mr. Swami is the Vice-Chairman of IRSE India, which is a section of IRSE, London. Mr. Swami is an active member of IET-UK, IRSE & IEEE-USA.


Day Two @ 11:50

Signalling Experts Panel: Best Practices in implementing to CBTC Systems

  •     As CBTC is becoming one of the standard systems in the world, how can we ensure that the system is reliable, secure and can withstand interferences? 
  •     What are the risks and security vulnerabilities in CBTC systems? 
  •     How can we ensure the interoperability between equipment supplied by vendors? Is it possible to achieve vendor neutrality? 
  •     What approach should we adopt towards resignalling on CBTC systems? Is this an opportunity or threat for vendors?
  •     Should legacy signalling be retained after CBTC has been installed?  

Day Two @ 15:20

Mitigating security challenges of communication based signalling systems in metros

back to speakers

<--linkedin--> <---end linkedin--->